Wednesday, April 6, 2016

More Demo & Fun Tile for the Entryway

More ripping out of stuff....2nd dumpster almost FULL as of end of day Monday!

Tile on it's way OUT!



& The Crappy Cheap Popcorn Ceiling is also about GONE!

Master Bath now just a shell of what it was........


Though the crappy bathtub still needs to head to the dumpster



& the view from the bathroom through to the closet - the closet is going to be stretched out that wall to the roofline to give us more space



& the big accomplishment for today was finding tile for the Entryway.  I was looking for blue slate chunks, but tough to find in the thickness needed for an interior floor with a consistent thickness.  Found this & Loved it, so ordered!

It fits well for the era we're going for & also will have diamond window coverings for the windows beside the door, so this works great.


OOOPS!!!!  Well, just got a call - apparently the one above is Sold Out & more is not arriving until June :(  So.....we'll go with our second choice, which is still pretty good - Black Slate in the same pattern :)




Monday, April 4, 2016

Next up.......Countertops!

We've had fun picking out countertops!  Here goes!!


The Kitchen will have White Quartz

And a little accent of orange formica on some shelves on the island....  This same laminate will be used on Caroline's built-in desktop


FUN Retro Boomerang Laminate in the Laundry room & around the utility sink in the garage



& The 2 Bathrooms.....our favorite - Recycled Glass with Blue inlaid glass!



& The Bar will have this Bamboo laminate in the bathroom & the main bar (the part of the bar where drinks are made....not the bartop - We have a very cool project for the Bar top.  Stay Tuned!)








Thursday, March 31, 2016

The first couple days of demo!

Because hideous green stripes were so much better than hideous brown stripes in the guest bathroom....


& Fancy FLOCKED brown & gold wallpaper originally adorned the Master Bath....yes, it's still fuzzy. 

Flocked in the Bathroom....WTF???



& the world's longest double sink is OUT!



Buh Bye 1975 water heater



Formerly a kitchen......




Tuesday, March 29, 2016

Hammers Start Swinging tomorrow!

& We're SO EXCITED!!!!!!!!!!!

An the interim, we've picked out tile for the whole house, so here are some pretty pictures for you to ogle :)


First-up....Utility Room....


& then Kitchen backsplash behind the hood  - will be like this, but with White instead of grey & also some dark aqua mixed in.  Some of the tiles will be bubbled & others will be flat. 


The Remainder of the Kitchen Backsplash will be a mix of these Matte Flat & Inverted Subway tiles...





Then - the Kitchen Floor, though this is not a great picture of it - it is a white tile with thin strands of Gray & Blue running through it.  This will also be on the floor of the Guest Bathroom.




The Main Tile in the Master Bath - Shower, Floors, Walls, etc.


Accent tile for the Master Bath


& Main Tile for the Guest bath, which will cover the walls & shower




Accent tile for the Guest Bath.....



Then we have the Floors of the showers in both bathrooms......it's going to feel SO GOOD on your feet!



& finally the floor tile for the Bar Bathroom....

Friday, March 25, 2016

FINALLY!!!!!!!!!!!!!!!!!

Our permit was FINALLY Approved by the backlogged City of Austin LATE TODAY!!!!!

& this week, these things appeared......


Demolition of the interior starts early next week - YIPPEE!!!!!!!!!



Monday, February 22, 2016

Getting Impatient :)

We started removing bits & pieces....ripping up some carpet, getting rid of the old ugly fireplace insert. Waiting....waiting.....

PERMITS & The Waiting Game.....

All we're waiting for now is PERMITS!!
Which, with all of the boom that Austin has had, is quite the adventure, as it's wait, wait, wait until your papers get to the top of the pile.

UGH!

As soon as that comes through, we can get started - YIPPEE!!!


Wednesday, January 20, 2016

CLOSE TO Swinging the first hammer!!!!!

Home Improvement loan......CHECK - signed our life away TODAY!!

City of Austin Construction Permits.......PENDING - We can start taking out all of the OLD UGLY stuff to make room for the new stuff as soon as the permit clears

So Close........Stay Tuned!


Wednesday, November 18, 2015

BEFORE Photos!

So here's what we're starting with.  The place needs LOTS of work, which is why we're waiting to move in until the renovation is complete on the main house.  So here's a bit of what we're starting with:

Kitchen.......to be taken down to the studs & footprint expanded into the room next to it (formerly the Game Room)





Hallway - all old tile will go.  To be replaced with CORK flooring


Former dining room.  Will be merged with the living room to form one living space


Sunken Living room

Living room - former dining room to the left. Stairs to the master bedroom behind fireplace


Room to become Caroline's office after reconfiguration, etc





Full bath off of the dining room.  To be turned into a Laundry/Utility room, along with a small office behind it

Guest bath to be gutted & redone with all tile

Master bath to be gutted down to the studs & reconfigured

Harvest Gold toilet!  To be put on Craigslist soon!

Backyard view from where the bar will be

Also from where the bar will be

Back of house.  All wood siding to be replaced with Hardie board & painted not brown (final color TBD).
We dig the front doors.  Plan is to have them painted a light Aqua color & replace the hardware with Starburst hardware.

 & the same doors from inside



Tuesday, October 27, 2015

Pretty Colors!!!!  Can't wait to see which ones we use :)